2 Inch Spacing - 100  Mini Christmas  Lights - Clear Bulbs - White Wire - Long Lead

2 Inch Spacing - 100 Mini Christmas Lights - Clear Bulbs - White Wire - Long Lead

$5.99
{{option.name}}: {{selected_options[option.position]}}
{{value_obj.value}}

2 Inch Spaced Clear Mini Christmas  Lights on White Wire - Long Lead - 100 bulbs, Stackable male plug. Approximate 24" lead - Approximately 16.5 ft in length - Has a 2.5 volt 0.4 watt super bright type lamp - Can connect up to 3 sets end to end.

Show More Show Less