Flexible FEP Sealed RTD Sensor 2 Wire Pt100 with 10 to 40ft Long Lead Wire Lengths for Chemical and Wet Applications
Long Length Flexible FEP Sealed RTD Sensor 2 Wire Pt100 for Chemical and Wet Applications, Temperature Operating range is - 90 to 400°F (-70 to 200°C) FEP Thin Wall Closed End tube provides protection of exposed temperature sensing element allows immersion into acids, caustics or overall wet agressive enviroments. FEP covering also provides electrical Isolation Pt100 (Platinum 100 ohm) High Accuracy Class A temperature sensor element with .385 Ohms change per 1°C. 2 Wire RTD Accuracycan be Decreased by Long Lengths of lead wire adding resistance to the measurement circuit. A Pt1000 (Platinum 1000 ohm design can compensate for the accuracy issue due to the 3.85 Ohms per degree °C change, a 10 times increase in the resistance as compared to 0.385 for a Pt100 sensor. Wire Leads - 10ft (120 inches) to 40ft (480 inches) or custom lengths of PFA insulated 26 Gage Stranded nickel plated 2 conductor twisted wire. Color code is 1 White and 1 Red color code on the inner wire and whit