String-Along Lead

String-Along Lead

$18.95
{{option.name}}: {{selected_options[option.position]}}
{{value_obj.value}}

This versatile lead is approximately 6 ft long. The quick-release panic snap is attached to the front llama's pack or pack saddle, either directly to the crossbuck or rigging. The other end is a regular snap that is clipped to the following llama's halter.  The ring that slides along the rope is handy if you need to tie the following llama to a tree or what ever is handy - just clip the quick release to the ring.  You can try it different ways to see what works best for your set-up.  Please note that this lead is not meant for use in training llamas to tie, it may break under extreme pressure. 5/8" poly rope.  Red, Black, Blaze Orange 

Show More Show Less