S12 EASA AD MLG Inspection

S12 EASA AD MLG Inspection

$2.00

June 7, 2019 | 2019-0130-E Following a production acceptance flight, the pilot noticed that the aeroplane was in a banked position on the ground. Further examination determined that an axle, connecting the main landing gear (MLG) leg to the center steel frame of the aeroplane, had been installed incorrectly. Other S12 aeroplanes may also be affected by this installation error.

Show More Show Less