Rollout 3: To Make Ready patch from Tim Gagnon

Rollout 3: To Make Ready patch from Tim Gagnon

$15.95

Rollout 3: To Make Ready patch from Tim Gagnon Fully embroidered 5.5" x 4.5" New! Only 100 available. August 16, 2022 9:55pm Artemis I rocket begins rollout to launchpad The Space Launch System (SLS) rocket and Orion spacecraft for the Artemis I mission are rolling to Launch Complex 39B at the Kennedy Space Center in Florida ahead of launch, that was targeted for Aug. 29. At 9:55 p.m. EDT (0155 GMT) the crawler-transporter began the 4.2-mile (6.8-km), journey from the Vehicle Assembly Building (VAB). Once outside the VAB high-bay doors, the crawler transporter will make a planned pause allowing the team to reposition the crew access arm before continuing to the pad. The journey is expected to take between 8 and 12 hours. The center image of the patch is a combined embroidery and photo sublimation to simulate the reflection in Turn Basin along side of the crawlerway. The tower is lit up and the stack on the Mobile Launch Platform shines in the light from xenon spotlights along the route.

Show More Show Less

Price History

$12.95 $15.95 (+$3)