STS-131 Mission Patch

STS-131 Mission Patch

$8.95
{{option.name}}: {{selected_options[option.position]}}
{{value_obj.value}}

STS-131 Mission Patch STS-131 is targeted for launch on April 5th, 2010. STS-131 mission will be flown by Space Shuttle Discovery. The primary payload is scheduled to be a Multi-Purpose Logistics Module. The mission will also perform an R&R on an ammonia tank assembly outside the station and return a LWAPA plate, located on the Columbus module. The mission also includes several on-board payloads, this mission has the most payloads since STS-107. Mission name STS-131 Space shuttle Discovery Launch pad 39A Launch date NET April 5th, 2010 Landing NET April 18th, 2010 Mission duration 13 days

Show More Show Less