25 Foot Long Flat Black Universal Telephone Handset Cord with Long Lead
$9.99
{{option.name}}:
{{selected_options[option.position]}}
{{value_obj.value}}
Brand New, The VoIP Lounge, 25 foot flat black universal handset cord. Cord length is 25 feet fully stretched and approximately 42 inches coiled. Cords & Lengths: As a telecom industry standard, the indicated lengths of handset cords are when they are fully stretched out, not when they are coiled in their packaging. Cords are rarely utilized at their full maximum stretched length, so it’s important to choose an appropriate length when buying. Available lengths for most cords are: 7 feet (11 inches coiled / unstretched) 9 feet (15 inches coiled / unstretched) 12 feet (22 inches coiled / unstretched) 25 feet (42 inches coiled / unstretched)
Show More
Show Less
Price History
$8.99
$9.99
(+$1)